On Air Now Tommy Greene Noon - 4:00pm Email
Now Playing DINNER PARTY NIALL HORAN Download

Contracts Signed Allowing Repair Works To Commence At Cliff Walk In Bray

Contracts have been signed for works to be carried out on the Bray side of the Cliff Walk to stabilize overhead rocks that are at risk of falling onto the walk.

The Cliff Walk was completely closed to the public at the end of October last year following a substantial rock fall.

Officials from Wicklow County Council are engaged in a process of acquiring land to move the walk away for the section affected by the landslide in 2021.

Later...

Co Wicklow Weather

  • Bray

    Medium-level cloud

    High: 19°C | Low: 11°C

  • Wicklow

    Medium-level cloud

    High: 17°C | Low: 11°C

  • Arklow

    Medium-level cloud

    High: 18°C | Low: 10°C

  • Blessington

    Medium-level cloud

    High: 19°C | Low: 11°C

  • Baltinglass

    Medium-level cloud

    High: 19°C | Low: 10°C

Listen Live Listen